Sandyford Road Quality Bus Corridor

The scheme comprised 1.7 km of road upgrade comprising of the following: - 

  • 1.7 km of road upgrade to include Bus Priority measures and Bus Lanes, Cycle paths and footpath upgrade works
  • New Surface Water sewer, watermain, telecom ducting
  • New public Lighting and signalised junctions including the introduction of a new signalised intersection to replace an existing roundabout
  • Road constructed while allowing a minimum of one way traffic at all times

Clifton Scannell Emerson Associates (CSEA) produced a Detailed Design and Contract Documents. CSEA provided construction supervision and acted as PSDP for the project.